LSSHub 2024 Release Notes
This page provides details about features, enhancements, and bug fixes for the latest versions of the LSSHub application.
See below for what's new in LSSHub V2.0.11.
Wednesday, October 23rd, 2024 | Version 2.0.11
Features and Enhancements
Distance Calculations: Facility Orientation | Distance calculations in LSSHub have been updated to account for facility orientation. When an LSS panel only had grid coordinates in LSSHub for one of the rotated fabs (see list below) the distance would be inaccurate. This release addresses that. Most fabs are orientated the same way in drawings, when you look at a drawing the grid Letters increment/decrement from left to right and the grid Numbers increment/decrement from bottom to top. Some fabs are rotated compared to the majority, the grid Letters increment/decrement from top to bottom and the grid Numbers increment/decrement from left to right. This affects distance calculations in LSSHub. A field called “Rotated” is editable in the “Facility” section in the administration settings in PowerHub. The value of this field has been set to true for the following fabs: Kulim KM8 Penang APF26 Rio Rancho F09 Ronler Acres D1X, D1Xm2, D1Xm3 |
Point field 2-digit limitation | When editing circuits on panels that have e field called “Point”, there was a 2-digit limit on this field. This limit has been removed. |
Wednesday, May 29th, 2024 | Version 2.0.10
Features and Enhancements
Chem/Gas selection | When selecting a chemical for HPM POCs the dropdown list of chemicals was not sorted alphabetically making it difficult to find the correct chemical. The Gas/Chem dropdown lists have been updated to sort the contents alphabetically. |
Dropdown lists Order of contents | Dropdown lists for facility, I/O Type. Config Type and Cable Type have been updated to sort the contents alphabetically. |
Completion tracker link | The link to the PIP/LSPx completion tracker was not directing to the tool's tracker page, this has been fixed. |